Field Services Excellence at Talos: From Pre-Assembly to On-Site Success

In today’s fast-paced supply chain and material handling environment, successful project execution requires more than delivering equipment on time — it demands field services installation efficiency. At Talos, we believe excellence is built through preparation, precision, and strong partnership from kickoff to closeout.  

Here's how the Talos team continues raising the bar on field services performance.  

Pre-Assembly and Kitting: The Game-Changer for Faster Installs 

One of the most impactful improvements Talos has made in the field is maximizing pre-assembly and kitting prior to shipment. 

When projects are kitted and pre-assembled before leaving our facility, installation time has improved by more than 50%.    

This approach delivers two major benefits: 

1.) Significant Reduction in On-Site Labor Hours 

If equipment arrives prepared to unload and move directly into a work cell, installation is faster, cleaner, and more efficient. 

2.) Reduced Chance of Human Error 

With components grouped, labeled, and staged together, the risk of incorrect part usage drops dramatically – saving time, rework, and frustration.  

Inside a Day in the Life of Talos Field Services 

Every successful installation begins with structure and intention. A standard day on-site includes: 

  • Morning kickoff meeting reviewing priorities, schedule, and parts availability 

  • Confirmation of installation direction and workflow for the day  

  • Daily report sent to the Project Manager 

  • Review of any change orders, schedule updates, or scope adjustments 

This disciplined approach keeps the customer informed, the team aligned, and the project progressing without surprises.  

Scaling Support for High-Demand or Multi-Site Projects 

When project timelines intensify, Talos scales quickly.  

We increase manpower, pull additional stocked parts, and broaden resources as needed. Recent examples include major projects such as TPA4, YVR6, CNO8, and SAT9, where manpower was doubled to meet aggressive deadlines. 

This flexible support model ensures we can meet our customer expectations – even in high-pressure environments. 

Tools That Keep Our Teams Aligned and On Schedule  

To maintain visibility and accountability, we equip our teams with: 

  • Budget tracking dashboards 

  • Detailed project schedules 

  • On-time delivery monitoring tools  

  • Chute inspections and site documentation 

  • Spare parts planning  

  • Clear installation drawings 

These assets empower our teams to operate efficiently while providing consistent transparency to customers from start to finish.  

Key Challenges Impacting Project Success 

Whether installing a new equipment design, retrofitting existing equipment, servicing systems, or managing complex integration schedules, our industry faces several common hurdles. The most recurring challenges include: 

A.) Industry-Wide Challenges 

  • On-time deliveries of equipment and parts 

  • Lead-times driven by supply chain fluctuations 

  • Labor and capacity constraints  

B.) Project-Execution Challenges 

  • Permitting delays (especially with only one PE licensed for certain regions) 

  • Scope changes impacting timelines and scheduling  

  • Facility specific operational constraints 

These challenges are real – but they are also opportunities to sharpen our process, strengthen communication, and refine our approach to execution.  

How Talos Proactively Overcomes These Challenges 

To ensure smooth project delivery, Talos has implemented strategies that keep teams aligned, customer-ready, and installation-focused: 

A.) Operational Focus 

  • Weekly planning and review meetings with Manufacturing, Sales Project Management, and Procurement 

  • Strong emphasis on capacity planning across departments 

  • Clear site readiness expectations (supported by formal Site Readiness Checklist) 

B.) Project Execution Improvements 

  • Faster project turnover with timely PO receipt 

  • Expanding our network of vetted subcontractors to support large-scale and multi-site projects 

  • Improved permitting coordination to reduce project delays 

By combining operational alignment with proactive communication, we’re able to set the stage for successful project deployment before our boots ever hit the ground. 

The Talos Difference 

What sets Talos Field Services apart isn’t just our technical capability – it’s the way we partner with customers throughout the entire lifecycle of a project. From early planning to post-install supports, we are committed to delivering a seamless, well-coordinated experience that builds trust, saves time, and keeps operations moving.  

At Talos, we don’t just install equipment. We equip our partners for long-term operational success. 

Want to learn how Talos can improve your installation timelines and reduce on-site labor hours? Contact our Field Services team today.

Next
Next

How MDR Reduces Energy Costs in Distribution Centers